Results:
Archive: July, 2026
Clear
  • MKARNS Nav Notice 26-23 Lock 1 Intermittent Delays

    Mariners should expect to experience intermittent delays at Norrell Lock (No. 1) NM 10.3 July 13, 2026 – July 17, 2026, between the hours of 6:00 a.m. and 6:00 p.m. The intermittent delays are required to facilitate work on the hydraulic system.
  • USACE reopens swim beach at Quarry Park

    The U.S. Army Corps of Engineers is reopening the swim beach at Quarry Park on Norfork Lake.
  • Russellville Marina docks temporarily closed as of July 8, 2026

    The U.S. Army Corps of Engineers Little Rock District is temporarily closing the docks at Russellville Marina, effective July 8, 2026, due to safety hazards and unmet terms of the facility's Commercial Concessions Lease Agreement. The repair shop, store and cabins, will remain open.
  • Temporary full road closure for Highway 178 across Bull Shoals Dam on July 9 cancelled

    The U.S. Army Corps of Engineers has cancelled the temporary full road closure scheduled July 9 for Highway 178 across Bull Shoals Dam. The closure scheduled for July 10 remains in effect.
  • USACE reopens swim beach at Dam Site Island

    The U.S. Army Corps of Engineers is reopening the swim beach at Dam Site Island on Beaver Lake. The temporary closure was a result of higher than acceptable E. coli levels that were found during routine testing conducted by field office personnel. Two acceptable water samples are required by the Arkansas Department of Health prior to reopening a swim beach.
  • USACE reminds everyone to be water safe this Independence Day weekend

    As the nation prepares to celebrate Independence Day with festivities, family gatherings and outdoor activities, the U.S. Army Corps of Engineers, Little Rock District, is urging everyone to prioritize water safety while enjoying the region’s lakes and rivers.