regulatory header graphic

Public Notice Information

If you would like to be placed on a mailing list to receive copies of public notices, please contact the Regulatory Branch, U. S. Army Corps of Engineers, P. O. Box 867, Little Rock, Arkansas 72203-0867, call (501)324-5295, or send an email to ceswl-pr-r@usace.army.mil and include your name, email address, mailing address, telephone number and indicate which counties in Arkansas or Missouri you would like to receive public notices.

NOTE: Due to budget cuts and escalating costs in processing and mailing of these public notices, we are requiring email addresses and internet access.  Only under special circumstances will we send copies of the public notices via the U. S. Postal Service.

The Public Notices are available in two electronic formats. To read the Public Notice text only (html format), click on the Public Notice number.  To view a Public Notice with its drawings, click on the Public Notice link in the attachments box. (*pdf format).

Results:
Archive: May, 2016
Clear
  • SWL 2016-00146 ext

    Expiration date: 7/5/2016

    PUBLIC NOTICE TIME EXTENSION: The time period for public comments for notice SWL 2016-00146, on the proposed wetland assesment method has been extended for 30 additional days. If comments were submitted on the previously issued public notice, you do not need to resubmit comments unless you want to address the time extension. Any previously submitted comments will be reviewed for the evaluation of the proposed wetland assessment method.

  • SWL 2015-00070-1

    Expiration date: 6/3/2016

    Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that the Arkansas Highway and Transportation Department (AHTD), PO Box 2261, Little Rock, Arkansas 72203-2261, has requested authorization for the placement of dredged and fill material in waters of the United States associated with constructing the final segment of the Searcy Bypass. The other two segments of the bypass, one south and one east of the proposed segment, are currently under construction. This segment would cross seven streams and one wetland area. The proposed project is located on the northwest side of Searcy and would connect State Highway 16 and State Highway 36, in sections 31, 32, and 33, T. 8 N., R. 7 W., and in sections 4, 5, 6, and 7, T. 7 N., R. 7 W., White County, Arkansas. The basic purpose of the project is to construct a connector between Highway 16 and Highway 36. The overall purpose of the project is to relieve congestion in Searcy by allowing traffic to avoid Race Street and Beebe Capps Expressway, and allow drivers traveling from the north and drivers traveling from U.S. Highway 67/167 to bypass traffic in downtown Searcy. The project would also provide traffic on the west side of Searcy better access to U.S. Highway 67/167. The project is not water dependent.

  • SWL 2016-00146

    Expiration date: 6/5/2016

    The five U.S. Army Corps of Engineers (Corps) Districts in the State of Missouri (Kansas City, Little Rock, Memphis, Rock Island, and St. Louis Districts) are proposing to adopt the MWAM for determining mitigation requirements for impacts to jurisdictional wetlands in the State of Missouri. The MWAM was developed in response to state and Federal resource agency requests for Corps implementation of a standard tool for the assessment of wetland impacts and mitigation actions to be used in all Corps Districts in the State of Missouri. The MWAM, if adopted, will be the primary tool used for the evaluation of wetland impacts and mitigation proposals for Section 404 of the Clean Water Act (33 USC 1344) Department of the Army permit evaluations within the State of Missouri.

  • SWL 2000-16752-1

    Expiration date: 5/23/2016

    Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that Greene County Highway Department, 2065 North Clifton Avenue, Springfield, Missouri 65803, has requested authorization for the placement of dredged and fill material in waters of the United States associated with proposed roadway and drainage improvements to West Republic Road between Golden Avenue and Highway FF. The proposed project is located in an unnamed tributary to Wilson Creek, in sections 8, 9, and 17, T. 28 N., R. 22 W., Springfield, Greene County, Missouri. The basic purpose of the project is to improve a roadway and drainage facilities. The overall purpose of the project is to safely accommodate increased traffic volumes and to alleviate flooding of the roadway and adjoining properties along this section of West Republic Road.