Results:
Archive: 2025
Clear
  • MKARNS Nav Notice No. SWL 25-03 Lock 7 Reopened

    Repairs to the hydraulic piping at Murray Lock and Dam (No. 7) NM 125.4 have been completed. The lock is currently open to traffic.
  • MKARNS Nav Notice No. SWL 25-02 Lock 7 Closure

    Due to an unexpected hydraulic piping failure, Murray Lock and Dam (No. 7) NM 125.4 is currently closed to navigation until further notice. Crews are onsite making emergency repairs at this time. A follow up notice will be distributed as soon as the Lock is reopened to navigation.