us army corps of engineers logo - white castle on red background

Regulatory    

Information & Links

Redirecting...

Public Notice Information

If you would like to be placed on a mailing list to receive copies of public notices, please contact the Regulatory Branch, U. S. Army Corps of Engineers, P. O. Box 867, Little Rock, Arkansas 72203-0867, call (501)324-5295, or send an email to ceswl-pr-r@usace.army.mil and include your name, email address, mailing address, telephone number and indicate which counties in Arkansas or Missouri you would like to receive public notices.

NOTE: Due to budget cuts and escalating costs in processing and mailing of these public notices, we are requiring email addresses and internet access.  Only under special circumstances will we send copies of the public notices via the U. S. Postal Service.

The Public Notices are available in two electronic formats. To read the Public Notice text only (html format), click on the Public Notice number.  To view a Public Notice with its drawings, click on the Public Notice link in the attachments box. (*pdf format).

2021 NWP Reissuance (MO)

CESWL-RD
Published March 8, 2021

SUBJECT: Special Public Notice for the Nationwide Permit Reissuance and Regional Conditions for the State of Missouri – Issuance of Regional Conditions.

SUMMARY: On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. These 16 NWPs will go into effect on March 15, 2021, and will expire on March 14, 2026:

• NWP 12 – Oil or Natural Gas Pipeline Activities
• NWP 21 – Surface Coal Mining Activities
• NWP 29 – Residential Developments
• NWP 39 – Commercial and Institutional Developments
• NWP 40 – Agricultural Activities
• NWP 42 – Recreational Facilities
• NWP 43 – Stormwater Management Facilities
• NWP 44 – Mining Activities
• NWP 48 – Commercial Shellfish Mariculture Activities
• NWP 50 – Underground Coal Mining Activities
• NWP 51 – Land-Based Renewable Energy Generation Facilities
• NWP 52 – Water-Based Renewable Energy Generation Pilot Projects
• NWP 55 – Seaweed Mariculture Activities
• NWP 56 – Finfish Mariculture Activities
• NWP 57 – Electric Utility Line and Telecommunications Activities
• NWP 58 – Utility Line Activities for Water and Other Substances

The 12 existing NWPs published in the January 13, 2021 final rule replace the 2017 versions of these NWPs. The 2017 versions of NWPs 12, 21, 29, 39, 40, 42, 43, 44, 48, 50, 51, and 52 expire on March 14, 2021. According to 33 CFR § 330.6(b), activities which have commenced (i.e, are under construction) or are under contract to commence in reliance upon an NWP that was verified under the 2017 NWP, will remain authorized provided the activity is completed within twelve months of the date of an NWP's expiration, modification, or revocation. If an activity that was verified under these 12 existing NWPs and has commenced or is under contract to commence, they will remain authorized until March 14, 2022.

REGIONAL CONDITIONS: With the publication of these NWPs in the Federal Register, the Northwestern Division has finalized regional conditions for these 16 NWPs in Missouri. Regional conditions provide additional protection for the aquatic environment and help ensure that the NWPs authorize only those activities with no more than minimal adverse environmental effects. Regional conditions help ensure protection of high value waters within the Little Rock District. The Regional Conditions are enclosed.

WATER QUALITY CERTIFICATION: The Section 401 Water Quality Certifications (WQCs) have been issued for Section 404 NWP activities by the Missouri Department of Natural Resources (MDNR). The WQCs were reviewed by the Northwestern Division (NWD) Commander and WQC is waived for NWPs 21, 44, 48, 50, 51, 52, 55, and 56. For NWPs 12, 29, 39, 40, 42, 43, 57, and 58, NWD has determined the MDNR WQC conditions (enclosed) will be added as regional conditions.

NWP 2017: There are 40 existing NWPs that were not reissued or modified by the January 13, 2021 final rule. These 40 NWPs were published in the January 6, 2017, issue of the Federal Register (82 FR 1860) and these NWPs remain in effect until the Corps issues a final rule reissuing those NWPs or March 18, 2022, whichever comes first. The 40 2017 NWPs that remain in effect are:

• NWP 1 – Aids to Navigation
• NWP 2 – Structures in Artificial Canals
• NWP 3 – Maintenance
• NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
• NWP 5 – Scientific Measurement Devices
• NWP 6 – Survey Activities
• NWP 7 – Outfall Structures and Associated Intake Structures
• NWP 8 – Oil and Gas Structures on the Outer Continental Shelf
• NWP 9 – Structures in Fleeting and Anchorage Areas
• NWP 10 – Mooring Buoys
• NWP 11 – Temporary Recreational Structures
• NWP 13 – Bank Stabilization
• NWP 14 – Linear Transportation Projects
• NWP 15 – U.S. Coast Guard Approved Bridges
• NWP 16 – Return Water From Upland Contained Disposal Areas
• NWP 17 – Hydropower Projects
• NWP 18 – Minor Discharges
• NWP 19 – Minor Dredging
• NWP 20 – Response Operations for Oil or Hazardous Substances
• NWP 22 – Removal of Vessels
• NWP 23 – Approved Categorical Exclusions
• NWP 24 – Indian Tribe or State Administered Section 404 Programs
• NWP 25 – Structural Discharges
• NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities
• NWP 28 – Modifications of Existing Marinas
• NWP 30 – Moist Soil Management for Wildlife
• NWP 31 – Maintenance of Existing Flood Control Facilities
• NWP 32 – Completed Enforcement Actions
• NWP 33 – Temporary Construction, Access, and Dewatering
• NWP 34 – Cranberry Production Activities
• NWP 35 – Maintenance Dredging of Existing Basins
• NWP 36 – Boat Ramps
• NWP 37 – Emergency Watershed Protection and Rehabilitation
• NWP 38 – Cleanup of Hazardous and Toxic Waste
• NWP 41 – Reshaping Existing Drainage Ditches
• NWP 45 – Repair of Uplands Damaged by Discrete Events
• NWP 46 – Discharges in Ditches
• NWP 49 – Coal Remining Activities
• NWP 53 – Removal of Low-Head Dams
• NWP 54 – Living Shorelines

The regional conditions and WQCs for these 40 NWPs, that were approved by division engineers in 2017, remain in effect while these 2017 NWPs remain in effect.

The January 13, 2021, Federal Register notice is available for viewing at
https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-and-modification-of-nationwide-permits.

As an alternative, interested parties can access the January 13, 2021, final rule and related documents at: https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/.

All Little Rock District NWP Documents and information will be posted at: https://www.swl.usace.army.mil/Missions/Regulatory/Types-of-Permits/#Nationwide%20Permits/.

POINT OF CONTACT: If you have questions or need additional information please contact Lisa Boyle via email at lisa.a.boyle@usace.army.mil or by phone at (501) 340-1385.


Questions or Comments

Email:  CESWL-Regulatory@usace.army.mil
Phone Number:  501-324-5295


Submit Applications to:
U.S. Army Corps of Engineers
ATTN: CESWL-RD
P.O. Box 867
Little Rock, AR  72203