Corps extends Millwood Lake drawdown

Published Aug. 18, 2016
News Release Images

News Release Images

ASHDOWN, Ark. – The Army Corps of Engineers is extending the current drawdown on Millwood Lake until Sept. 2. 

The lake was gradually drawn down to elevation 257.2 feet, which is two foot below the normal pool elevation.  Because of recent rainfall the drawdown will now extend until Sept. 2 at which time the lake will be allowed to refill to its normal pool elevation of 259.2 feet.

Boaters should continue to exercise extra caution because more shallow areas and other unknown hazards may appear.  Also, boaters should be cautious when launching boats during the drawdown. 

For more information call Millwood Lake Project Office at 870-898-3343.

Recreation information can be found on the Internet at www.swl.usace.army.mil, on Facebook at www.facebook.com/littlerockusace, and on Twitter at https://twitter.com/#!/usacelittlerock.    


Contact
Steve Spicer
870-898-3343

Release no. UNRELEASED