CORPS TO BEGIN DRAWDOWN AT MILLWOOD LAKE

Published July 11, 2018
News Release Images

News Release Images

ASHDOWN, Ark., – The Army Corps of Engineers will begin a drawdown of Millwood Lake July 16 in an effort to improve shoreline vegetation.

The lake will be held near elevation 257.2 until late August, at that time the lake will be permitted to rise as conditions allow, with the target to be back to conservation pool, elevation 259.2, by the end of October.

During the drawdown, boaters should exercise extreme caution and always wear a life jacket because submerged stumps and shallow areas will be more prominent, especially in boat lanes.  

The drawdown exposes an extensive amount of shoreline for re-vegetation; promoting water quality, habitat for wintering waterfowl and fish production.  Additionally it concentrates prey fish for predator consumption, promoting growth and production for larger fish.

The drawdown was requested by the Southwest Arkansas Water District from their consumptive storage in coordination with the Arkansas Game and Fish Commission.

For more information on Millwood Lake and the drawdown contact the Millwood Project Office at 870-898-3343.


Contact
Laurie Driver
501-324-5551

Release no. 18-116