us army corps of engineers logo - white castle on red background Black River Study

Study Completed: March 6, 2023

Study Overview

Location: Butler County, Missouri - Black River Watershed

Purpose: Evaluate flooding issues and potential mitigation strategies along the Black River

Study Area: From Clearwater Dam to Corning, Arkansas (approximately 200 miles)

Key Findings

  • Primary Cause: Recent flooding is primarily due to increased precipitation patterns
  • Precipitation Trends: Statistically significant increases in annual totals, storm intensity, and frequency of high-intensity events
  • Streamflow Changes: Significant increases in baseflow and runoff components
  • Groundwater Impact: High connectivity between groundwater and surface water prolongs flooding conditions
  • Channel Stability: No major bed changes from 1948-2019, indicating flooding increases are precipitation-driven

Analysis Components

The comprehensive study included:

  • Clearwater Dam operational scenario analysis
  • Geomorphic mapping and channel analysis
  • Precipitation and streamflow trend analysis
  • Groundwater-surface water interaction modeling (GSSHA)
  • Surface water hydraulic analysis (HEC-RAS)

Implementation Options & Recommendations

1. Standard Channel Maintenance with Low Water Weir
Partial channel cleanout from Hargrove Pivot Bridge to state line with flow control at Swift Ditch
RECOMMENDED
2. Two-Stage Ditches and Local Drainage Improvements
Improve local drainage systems with enhanced ditch designs and potential tile drains
RECOMMENDED
3. Levee Setbacks
Relocate levees away from river channel to provide additional floodplain
RECOMMENDED
4. Transverse Levee Removal
Remove short levees at Coon Island Conservation Area
LIMITED BENEFIT
5. Comprehensive Channel Cleanout
System-wide channel dredging and debris removal
NOT RECOMMENDED
6. Channel Straightening
Create cutoffs to straighten meandering river sections
NOT RECOMMENDED
7. Clearwater Dam Operational Changes
Modify dam operations to reduce downstream flooding
NOT EFFECTIVE

Next Steps

The study recommends a combined approach focusing on:

  • Immediate: Standard channel maintenance and debris removal for safety
  • Short-term: Implementation of two-stage ditches and local drainage improvements
  • Long-term: Consideration of strategic levee setbacks where feasible

Project Information

U.S. Army Corps of Engineers
Little Rock District
Hydraulics and Technical Services Branch

700 W. Capitol Ave
Little Rock, AR 72201

For additional information about this study, please contact the Little Rock District.