Results:
Tag: IRRM
Clear
  • Beaver IRRM Environmental Assessment Public Comment Period

    The U.S. Army Corps of Engineers, Little Rock District (Corps), is preparing an Environmental Assessment (EA) to document the beneficial and adverse effects of implementing an Operational Interim Risk Reduction Measure (IRRM) at Beaver Dam on the White River. The IRRM will reduce risks to life safety, property and natural resources associated with being able to operate the dam effectively during extreme high-water events.
  • USACE to host a public workshop in White County regarding Beaver Dam interim risk reduction measures

    LITTLE ROCK, Ark. – The U.S. Army Corps of Engineers, Little Rock District has scheduled a drop-in public workshop to discuss the Beaver Dam Interim Risk Reduction Measures from 5 p.m. to 8 p.m. at the White County Emergency Management Office, in Searcy, Arkansas on Dec. 16. Those wishing to attend can drop-in anytime during the meeting to speak with a USACE representative and address any issues they may have about the interim risk reduction measures.