MKARNS Nav Notice No. SWL 24-52 USCG Advisory Van Buren Railroad Bridge NM 300.8

Little Rock District - USACE
Published July 9, 2024
Navigation Notice

Navigation Notice

NAVIGATION NOTICE       Number SWL 24-52
McClellan-Kerr Arkansas River Navigation System

July 9, 2024

In Reply Refer to:  CESWL-OP

P. O. Box 867
Little Rock, AR 72203-0867
PH. 501-324-5096

USCG ADVISORY
VAN BUREN RAILROAD BRIDGE (NM 300.8)
MCCLELLAN-KERR ARKANSAS RIVER NAVIGATION SYSTEM

Mariners are advised that the rehabilitation work on the Van Buren Railroad Drawbridge (NM 300.8), as stated in Nav Notice 24-07, is scheduled to begin on August 22, 2024 at 5 a.m. and last until September 8, 2024, at 5 p.m. During this time the bridge will remain in the lowered position, however, onsite crews will attempt to clear traffic on day 9 or 10 while test lifts are being conducted. Mariners will also be allowed to shuttle barges beneath the closed span while the navigation span is clear of equipment. Mariners should contact the onsite workboat, M/V Sir Dolan, on VHF-FM channel 16 or onsite crews by phone at (573) 544-1193 and (816) 721-3261 for more details.

Questions or requests for additional information concerning this notice should be directed to the Little Rock District Office at (501) 324-5096 or you may email CESWL-OP-OM@usace.army.mil.

//signed// (for)
Chief, Operations Division


Contact
CESWL-Public Affairs
5013245551
ceswl-pa@usace.army.mil

Release no. 24-101