Montgomery Point Lock and Dam

These photographs were taken of construction activities on-going at the Montgomery Point Lock and Dam work site. The work consists of construction of a new lock, dam, control tower, mooring area, diversion channel, channel revetments and dikes.


Job Montgomery Point Lock & Dam
Job Number mpld
Description Construction

Photo Caption Description
Flow Deflector 1/16/99 11:18:30 AM
Placing outboard waler on the flow deflector.
Cofferdam Cell Construction 1/16/99 9:17:43 AM
Setting template for Cell 46.
Flow Deflector 1/8/99 2:29:04 PM
Installation of z-piles in flow deflector.
Flow Deflector 1/5/99 2:13:49 PM
Rig on left holds flow deflector frame while rig on right installs pipe pile.
Cell Fill 1/4/99 2:21:43 PM
Placement of cell fill in Cell 1.
Flow Deflector 1/4/99 2:13:36 PM
Downstream leg of flow deflector. All frames have been installed.
Cofferdam Cell Construction 12/22/98 3:33:56 PM
Excavation of obstruction beneath sheet piles in Cell 19.
Flow Deflector 12/22/98 3:08:11 PM
Maneuvering flow deflector frame into place.
Flow Deflector 12/22/98 3:02:04 PM
Flow deflector frames in place between Cells 16 and 47.