Flooding Structure |
7/19/99 10:26:15 AM Nearly completed flooding structures in Arcs 28A and 29A.
|
 |
Cofferdam Construction |
7/19/99 10:25:15 AM Connection between Cell #46 and the embankment portion of the cofferdam.
|
 |
Dewatering Well Installation |
7/19/99 10:24:10 AM Installation of discharge piping along southern leg of cofferdam. This piping will carry discharge from the land-based wells.
|
 |
|
7/19/99 9:52:40 AM
|
 |
Dewatering Well Installation |
7/19/99 9:49:34 AM Developing well #34.
|
 |
Temporary Electrical |
7/19/99 9:48:30 AM Installation of cable trays on cofferdam cells.
|
 |
Dewatering Well Installation |
7/19/99 9:30:30 AM Drilling well #36.
|
 |
Cofferdam Cell Construction |
7/19/99 9:25:18 AM Looking upstream along the northern leg of the cofferdam.
|
 |
Cofferdam Cell Construction |
7/19/99 9:24:50 AM Looking upstream toward upstream leg of cofferdam.
|
 |
Cofferdam Cell Construction |
7/19/99 9:24:40 AM Downstream leg of cofferdam looking toward right descending bank. Note dredged material placed along the interior perimeter. This material will be used in the interior stability berm.
|