Construction of Cell 16 |
6/23/98 11:11:47 AM JAJ/A workers installing sheet piles in Cell 16
|
 |
Construction of Cell 16 |
6/23/98 3:30:40 PM Vibratory hammer being used to drive sheet piles in Cell 16
|
 |
Construction of Cell 16 |
6/23/98 3:29:39 PM Vibratory hammer being used to drive sheet piles in Cell 16
|
 |
Construction of Cell 16 |
6/22/98 10:35:53 AM Genie Lift being used to preclude the need for a "top man" or "monkey" to thread the sheets
|
 |
Construction of Cell 16 |
6/19/98 4:59:22 PM JAJ/A employees "threading" sheet pile in Cell 16
|
 |
Diversion Channel Dredging |
6/14/98 2:48:14 PM Sample of roots that get caught in the dredge pump
|
 |
Diversion Channel Dredging |
6/14/98 3:12:34 PM Discharge pipeline leading to the Mississippi River. Note tow in background.
|
 |
Diversion Channel Dredging |
6/17/98 1:02:12 PM Water jet being used to "knock down" high bank of material to prevent caving and burial of cutterhead
|
 |
Flow Deflector Frames |
6/18/98 1:51:48 PM Flow deflector frame after fabrication at Vanguard Services, Inc., in New Johnsonville, TN
|
 |
Stockpiled sheet piles |
3/13/98 10:27:44 AM Sheet piles stockpiled along the left descending bank of the Arkansas Post Canal just upstream of Norrell Lock and Dam
|