These photographs were taken of construction activities on-going at the Montgomery Point Lock and Dam construction site. The project is located on the White River at N.M. 0.5 of the McClellan-Kerr Arkansas River Navigation System. The prime contractor is J.A. Jones/Atkinson -Constructors, A Joint Venture.

The work consists of construction of a new lock, dam, crest gate dewatering system, diversion channel, channel revetments, dikes, control tower, and mooring area. The structure consists of a 110-foot-wide by 600-foot-long (usable dimension) miter-gated U-frame concrete lock, with 524-foot concrete floating guide walls; a 300-foot-wide bottom lift hinged-crested gated navigable pass concrete spillway, including ten 30-foot-wide gates; and a 200-foot-wide fixed crest concrete overflow spillway.


Job Montgomery Point Lock & Dam
Job Number MPRO-KTR
Description Construction

Photo Caption Description
Navigable Pass 3/17/2003 11:01:20 AM
Luhr Bros. placing R5000 down stream of navigable pass.
Aerial March 2003 3/7/2003 7:51:42 AM
Cofferdam from upstream
Aerial March 2003 3/7/2003 7:50:46 AM
Cofferdam from downstream.
Aerial March 2003 3/7/2003 7:50:20 AM
Cofferdam from south bank.
Aerial March 2003 3/7/2003 7:47:36 AM
Cofferdam from north bank
Aerial March 2003 3/7/2003 7:45:14 AM
Cofferdam from downstream
Aerial March 2003 3/7/2003 7:42:32 AM
Cofferdam from downstream, north bank.
Control Tower 3/5/2003 1:42:14 PM
Control/observation room at 196 elevation after cantilever form removed.

Photographs were taken by:

Montgomery Point Lock and Dam Resident Office
35B Wild Goose Lane
Tichnor, Arkansas 72166
Phone: 870-548-3300
Fax: 870-548-3500

and

J.A. Jones/Atkinson-Constructors, A Joint Venture
P.O. Box 849
Rosedale, Mississippi 38769
Phone: 662-759-9891
Fax: 662-750-9807