| Photo |
Caption |
Description |
 |
R-3 |
1/31/2003 3:01:00 PM Winter protection
|
 |
Miter Gate |
1/31/2003 2:56:12 PM Looking upstream at d/s Miter gates
|
 |
O & M Area |
1/30/2003 4:07:10 PM Placing compacted pervious fill in O & M Work Area.
|
 |
2.0R |
1/30/2003 3:52:18 PM Excavation down to elevation 2.0R at STA 53+00
|
 |
Crest Gates |
1/18/2003 1:57:18 PM Gate #5 in raised position
|
 |
Floating Guide Walls |
1/15/2003 4:48:04 PM L-2 looking downstream
|
 |
Lock Chamber |
1/14/2003 2:36:00 PM Looking downstream from 196
|
 |
Crest Gates |
1/13/2003 3:53:50 PM Drive shaft end
|
 |
Crest Gates |
1/13/2003 3:41:28 PM Drive shaft wedge connection. Note end of drive shaft with Alcove cove installed next to torque tube lower bearing housing.
|
 |
Crest Gates |
1/13/2003 2:31:56 PM QA check for Crest Gate 4 bearing alignment Oxford Engineering
|
 |
Aerial January 2003 |
1/9/2003 7:32:16 AM Cofferdam from downstream.
|
 |
Aerial January 2003 |
1/9/2003 7:31:30 AM Cofferdam from upstream.
|
 |
Aerial January 2003 |
1/9/2003 7:28:32 AM Cofferdam from north bank.
|
 |
Aerial January 2003 |
1/9/2003 7:26:32 AM Cofferdam from south bank.
|
 |
Aerial January 2003 |
1/9/2003 7:24:38 AM Cofferdam from north bank.
|
 |
Aerial January 2003 |
1/9/2003 7:23:00 AM Cofferdam from downstream north bank.
|
 |
Miter Gate |
1/8/2003 2:37:58 PM Upstream Miter Gate - welders installing upstream fenders.
|
 |
Control Tower |
1/8/2003 2:27:34 PM Control room/ observation scaffolding for cantilever formwork
|
 |
Upper Gallery |
1/2/2003 11:14:06 AM Piping and cable tray installation (landside).
|
 |
R-24 |
1/2/2003 10:56:22 AM Looking upstream
|