Mooring Area |
5/30/2002 3:36:00 PM Backfill in mooring area.
|
 |
Abutment Wall 7 |
5/30/2002 3:27:56 PM Concrete finishing in abutment wall 7.
|
 |
Mooring Area |
5/28/2002 2:53:42 PM Backfilling in mooring area.
|
 |
Abutment Wall |
5/11/2002 8:49:54 AM Survey work in Abutment Wall - 8, lift 2.
|
 |
Aerial May 2002 |
5/9/2002 6:46:34 AM Cofferdam from north bank.
|
 |
Aerial May 2002 |
5/9/2002 6:46:08 AM Cofferdam from downstream.
|
 |
Aerial May 2002 |
5/9/2002 6:42:08 AM Cofferdam from south bank.
|
 |
Aerial May 2002 |
5/9/2002 6:40:48 AM Cofferdam from upstream.
|
 |
Aerial May 2002 |
5/9/2002 6:36:46 AM Cofferdam from downstream.
|
 |
Aerial May 2002 |
5/9/2002 6:34:26 AM Cofferdam from downstream.
|
 |
Control Tower |
5/8/2002 11:33:16 AM Rebar installation at control tower.
|
 |
NP-3 |
5/7/2002 3:18:50 PM Form work in NP-3.
|
 |
Control Tower |
5/6/2002 4:15:44 PM Install watertight doors at control tower.
|
 |
Abutment Wall |
5/2/2002 3:45:36 PM Rebar installation in abutment wall.
|
 |
NP-1 |
5/2/2002 3:44:14 PM Form work in NP-1
|