| Photo |
Caption |
Description |
 |
Monolith U-4 |
2/25/2002 3:41:50 PM Form work at monolith U-4, lift 3, river side.
|
 |
Monolith U-21 |
2/23/2002 7:36:52 AM Form work and rebar installation for tear drops at monolith U-21, lift 1, land side.
|
 |
Stilling Basin 5 |
2/21/2002 10:17:16 AM Form work and rebar installation at stilling basin 5, lift 1.
|
 |
Mooring Area |
2/12/2002 2:40:16 PM Compacting fill at mooring area.
|
 |
Monolith U-21 |
2/12/2002 2:39:50 PM Installing forms for tear drops at monolith U-21, lift 2, river side.
|
 |
Monolith U-21 |
2/11/2002 3:00:22 PM Installing forms for tear drops in U-21, lift 2, land side.
|
 |
Mooring Area |
2/4/2002 4:02:06 PM Excavation in mooring area.
|