| Photo |
Caption |
Description |
 |
Stilling Basin 8 and 9 |
4/25/2002 2:31:14 PM Form work in stilling basin 8 & 9.
|
 |
Abutment Wall |
4/25/2002 2:30:46 PM Excavating for abutment walls 4 & 5.
|
 |
Abutment Wall |
4/25/2002 2:27:06 PM Excavating for abutment walls 4 & 5.
|
 |
Monolith U-5 |
4/25/2002 2:25:46 PM Clean up at monolith U-5, lift 8, land side.
|
 |
Mooring Area |
4/25/2002 2:20:20 PM Driving piles in mooring area.
|
 |
Overflow Spillway 3 & 4 |
4/25/2002 2:18:30 PM Form work and rebar installation for overflow spillways 3 & 4.
|
 |
NP-2 |
4/22/2002 10:05:06 AM Installing electrical conduit in NP-2, lift 7.
|
 |
Control Tower |
4/22/2002 10:01:30 AM Rebar installation at control tower.
|
 |
Monolith U-5 |
4/22/2002 9:57:28 AM Clean up work at monolith U-5, lift 8, land side.
|
 |
Monolith U-17 |
4/18/2002 2:12:02 PM Drilling anchors for stiffener plates at monolith U-17.
|
 |
L-22 |
4/18/2002 2:03:54 PM Form work at monolith L-22, lift 4.
|
 |
Monolith U-17 |
4/18/2002 7:23:18 AM Installing trunnion beam and anchors at monolith U-17.
|
 |
Monolith U-21 |
4/18/2002 7:22:52 AM Concrete finishing at monolith U-21, lift 3
|
 |
Monolith U-21 |
4/15/2002 3:45:50 PM Rebar installation at monolith U-21, lift 3, river side.
|
 |
NP-2 |
4/15/2002 3:43:38 PM Formwork at NP-2, lift 7
|
 |
Mooring Cell |
4/15/2002 1:51:58 PM Preparation of mooring cell.
|
 |
Overflow Spillway 3 & 4 |
4/13/2002 9:45:56 AM Form work in overflow spillways 3 & 4.
|
 |
Overflow Spillway 3 & 4 |
4/13/2002 9:38:52 AM Form work at overflow spillways 3 & 4.
|
 |
Control Tower |
4/12/2002 11:07:54 AM Rebar installation at control tower.
|
 |
Monolith U-5 |
4/12/2002 6:30:52 AM Installing check post at monolith U-5, lift 8, river side.
|
 |
Aerial April 2002 |
4/8/2002 7:18:16 AM Cofferdam from downstream
|
 |
Aerial April 2002 |
4/8/2002 7:09:22 AM Cofferdam from South Bank.
|
 |
Aerial April 2002 |
4/8/2002 7:08:30 AM Cofferdam from upstream
|
 |
Aerial April 2002 |
4/8/2002 7:07:36 AM Cofferdam from upstream.
|
 |
Aerial April 2002 |
4/8/2002 7:07:10 AM Cofferdam from North Bank.
|
 |
Aerial April 2002 |
4/8/2002 7:05:48 AM Cofferdam from downstream
|
 |
Excavation |
4/4/2002 4:02:02 PM Excavating of abutment wall area.
|
 |
Monolith U-8 |
4/3/2002 3:43:34 PM Form work at monolith U-8, lift 8, land side.
|
 |
Monolith U-7 |
4/3/2002 3:43:06 PM Concrete finishing at monolith U-7, center.
|
 |
Monolith U-5 |
4/3/2002 3:41:18 PM Check post installation at monolith U-5, lift 8, land side.
|
 |
Monolith U-7 |
4/3/2002 3:39:56 PM Concrete finishing at monolith U-7, center.
|
 |
Stilling Basin - 1 |
4/3/2002 3:37:06 PM Installing rebar at stilling basin 1.
|
 |
Alcove Blockout |
4/3/2002 3:36:38 PM Form alcove blockout and embeds.
|
 |
NP-2 |
4/3/2002 3:36:10 PM Installing torque bearing anchors at NP-2, lift 8.
|
 |
Monolith U-20 |
4/1/2002 4:30:14 PM Installing wall armor at monolith U-20, lift 3, river side.
|