Montgomery Point Lock and Dam

These photographs were taken of construction activities on-going at the Montgomery Point Lock and Dam construction site. The project is located on the White River at N.M. 0.5 of the McClellan-Kerr Arkansas River Navigation System. The prime contractor is J.A. Jones/Atkinson -Constructors, A Joint Venture.

The work consists of construction of a new lock, dam, crest gate dewatering system, diversion channel, channel revetments, dikes, control tower, and mooring area. The structure consists of a 110-foot-wide by 600-foot-long (usable dimension) miter-gated U-frame concrete lock, with 524-foot concrete floating guide walls; a 300-foot-wide bottom lift hinged-crested gated navigable pass concrete spillway, including ten 30-foot-wide gates; and a 200-foot-wide fixed crest concrete overflow spillway.


Job Montgomery Point Lock & Dam
Job Number MPRO-KTR
Description Construction

Photo Caption Description
Stilling Basin 8 and 9 4/25/2002 2:31:14 PM
Form work in stilling basin 8 & 9.
Abutment Wall 4/25/2002 2:30:46 PM
Excavating for abutment walls 4 & 5.
Abutment Wall 4/25/2002 2:27:06 PM
Excavating for abutment walls 4 & 5.
Monolith U-5 4/25/2002 2:25:46 PM
Clean up at monolith U-5, lift 8, land side.
Mooring Area 4/25/2002 2:20:20 PM
Driving piles in mooring area.
Overflow Spillway 3 & 4 4/25/2002 2:18:30 PM
Form work and rebar installation for overflow spillways 3 & 4.
NP-2 4/22/2002 10:05:06 AM
Installing electrical conduit in NP-2, lift 7.
Control Tower 4/22/2002 10:01:30 AM
Rebar installation at control tower.
Monolith U-5 4/22/2002 9:57:28 AM
Clean up work at monolith U-5, lift 8, land side.
Monolith U-17 4/18/2002 2:12:02 PM
Drilling anchors for stiffener plates at monolith U-17.
L-22 4/18/2002 2:03:54 PM
Form work at monolith L-22, lift 4.
Monolith U-17 4/18/2002 7:23:18 AM
Installing trunnion beam and anchors at monolith U-17.
Monolith U-21 4/18/2002 7:22:52 AM
Concrete finishing at monolith U-21, lift 3
Monolith U-21 4/15/2002 3:45:50 PM
Rebar installation at monolith U-21, lift 3, river side.
NP-2 4/15/2002 3:43:38 PM
Formwork at NP-2, lift 7
Mooring Cell 4/15/2002 1:51:58 PM
Preparation of mooring cell.
Overflow Spillway 3 & 4 4/13/2002 9:45:56 AM
Form work in overflow spillways 3 & 4.
Overflow Spillway 3 & 4 4/13/2002 9:38:52 AM
Form work at overflow spillways 3 & 4.
Control Tower 4/12/2002 11:07:54 AM
Rebar installation at control tower.
Monolith U-5 4/12/2002 6:30:52 AM
Installing check post at monolith U-5, lift 8, river side.
Aerial April 2002 4/8/2002 7:18:16 AM
Cofferdam from downstream
Aerial April 2002 4/8/2002 7:09:22 AM
Cofferdam from South Bank.
Aerial April 2002 4/8/2002 7:08:30 AM
Cofferdam from upstream
Aerial April 2002 4/8/2002 7:07:36 AM
Cofferdam from upstream.
Aerial April 2002 4/8/2002 7:07:10 AM
Cofferdam from North Bank.
Aerial April 2002 4/8/2002 7:05:48 AM
Cofferdam from downstream
Excavation 4/4/2002 4:02:02 PM
Excavating of abutment wall area.
Monolith U-8 4/3/2002 3:43:34 PM
Form work at monolith U-8, lift 8, land side.
Monolith U-7 4/3/2002 3:43:06 PM
Concrete finishing at monolith U-7, center.
Monolith U-5 4/3/2002 3:41:18 PM
Check post installation at monolith U-5, lift 8, land side.
Monolith U-7 4/3/2002 3:39:56 PM
Concrete finishing at monolith U-7, center.
Stilling Basin - 1 4/3/2002 3:37:06 PM
Installing rebar at stilling basin 1.
Alcove Blockout 4/3/2002 3:36:38 PM
Form alcove blockout and embeds.
NP-2 4/3/2002 3:36:10 PM
Installing torque bearing anchors at NP-2, lift 8.
Monolith U-20 4/1/2002 4:30:14 PM
Installing wall armor at monolith U-20, lift 3, river side.

Photographs were taken by:

Montgomery Point Lock and Dam Resident Office
35B Wild Goose Lane
Tichnor, Arkansas 72166
Phone: 870-548-3300
Fax: 870-548-3500

and

J.A. Jones/Atkinson-Constructors, A Joint Venture
P.O. Box 849
Rosedale, Mississippi 38769
Phone: 662-759-9891
Fax: 662-750-9807