Dam Axis |
06/20/2001 12:38:25 PM View of dam axis looking to left descending bank.
|
 |
Centerline Lock |
06/20/2001 12:36:28 PM View of lock centerline looking downstream.
|
 |
Site View |
06/20/2001 12:35:25 PM View of job site looking downstream.
|
 |
Centerline Lock |
06/20/2001 12:31:38 PM View of lock centerline looking upstream.
|
 |
Aerial View |
06/11/2001 8:12:44 AM Aerial of cofferdam from mouth of White River.
|
 |
Aerial View |
06/11/2001 8:07:50 AM Aerial view of lock and navigable pass looking downstream.
|
 |
Aerial View |
06/11/2001 8:06:56 AM Aerial view of cofferdam taken from south bank.
|
 |
Aerial View |
06/11/2001 8:05:36 AM Aerial of cofferdam from upstream of job site.
|
 |
Aerial |
06/11/2001 8:03:48 AM Aerial of cofferdam from north bank.
|
 |
Aerial View |
06/11/2001 8:03:20 AM Aerial of cofferdam from downstream.
|
 |
Navigable Pass Spillway |
06/08/2001 6:09:39 AM Concrete finishing at NP-4, lift 1.
|
 |
Monolith U-13 |
06/02/2001 7:59:36 AM Installing rebar at monolith U-13, lift 4, landside.
|