| Photo |
Caption |
Description |
 |
View Along Dam Axis |
10/25/2000 1:34:49 PM View of centerline of dam looking landside.
|
 |
View Along Centerline of Lock |
10/25/2000 1:32:50 PM View of centerline of lock looking upstream.
|
 |
View Along Centerline of Lock |
10/25/2000 11:12:08 AM View of centerline of lock looking downstream.
|
 |
H-Piles at NPAP-2 |
10/25/2000 11:07:56 AM Pile Driving at NPAP-2.
|
 |
Navigable Pass Mud Slab |
10/25/2000 11:06:47 AM Foundation preparation for mud slab at Navigable Pass.
|
 |
Monolith U-15 |
10/16/2000 2:02:25 PM Monolith U-15 riverside prior to concrete placement.
|
 |
Monolith U-15 |
10/16/2000 2:00:17 PM Clean-up at Monolith U-15 riverside.
|
 |
Monolith U-11 |
10/05/2000 2:52:41 PM Preparing for concrete placement at Monolith U-11/1 looking downstream.
|
 |
Aerial Photo |
10/05/2000 7:12:56 AM Aerial photo taken from South bank.
|
 |
Aerial Photo |
10/05/2000 7:11:44 AM Aerial photo taken from diversion channel or North bank.
|
 |
Aerial Photo |
10/05/2000 7:06:48 AM Aerial photo of job site taken from the mouth of the White River.
|
 |
Aerial Photo |
10/05/2000 7:04:36 AM Aerial photo of job site taken from the south bank
|
 |
Monolith U-10 |
10/04/2000 12:28:29 PM Cleaning and preparing for concrete placement at Monolith U-10 landside.
|
 |
Monolith U-9 |
10/04/2000 12:12:19 PM Form work at Monolith U-9
|