| Photo |
Caption |
Description |
 |
Lock and Spillway Excavation |
05/18/2000 7:40:40 AM Excavation for Monolith U-6.
|
 |
Lock and Spillway Excavation |
05/18/2000 7:38:22 AM Excavation for Monolith U-6.
|
 |
Batch Plant |
05/10/2000 8:17:21 AM Construction of Contractor's concrete batch plant.
|
 |
Stilling Basin Cutoff Wall |
05/05/2000 12:32:38 PM Placing sheet piles for cutoff wall at downstream end of navigable pass stilling basin.
|
 |
Stilling Basin Cutoff Wall |
05/05/2000 12:26:46 PM Placing sheet piles for cutoff wall at downstream end of navigable pass stilling basin.
|
 |
Stilling Basin Cutoff Wall |
05/05/2000 12:22:42 PM Placing sheet piles for cutoff wall at downstream end of navigable pass stilling basin.
|
 |
Stilling Basin Cutoff Wall |
05/05/2000 12:19:26 PM Removing log from beneath cutoff wall.
|
 |
Stilling Basin Cutoff Wall |
05/01/2000 3:05:20 PM Placing sheet piles for cutoff wall at downstream end of navigable pass stilling basin.
|