| Photo |
Caption |
Description |
 |
Slurry Wall A |
1/29/00 1:08:56 PM Excavation of slurry wall A near Cell 29.
|
 |
Slurry Wall A |
1/27/00 4:11:14 PM Excavation of slurry wall A near Cell 32.
|
 |
Batch Plant |
1/26/00 2:53:23 PM Placing concrete in batch plant footing.
|
 |
Lock and Spillway Excavation |
1/26/00 2:46:12 PM General view of excavation operations.
|
 |
Slurry Wall A |
1/26/00 2:44:59 PM Mixing backfill near station 19+00±.
|
 |
Revetment 2.0R |
1/26/00 2:37:54 PM Placing bankpaving stone near station 27+50±.
|
 |
Revetment 2.0R |
1/26/00 2:35:19 PM Placing bankpaving stone near station 27+50±.
|
 |
Lock and Spillway Excavation |
1/25/00 3:08:48 PM Excavation operations as seen looking toward the right descending bank.
|
 |
Slurry Wall C |
1/14/00 9:28:56 AM Excavation of Slurry Wall C.
|
 |
Slurry Wall A |
1/11/00 12:55:04 PM Mixing and placing backfill in Slurry Wall A.
|
 |
Lock and Spillway Excavation |
1/7/00 2:29:47 PM Removal of slide material and placement of backfill near Cell 46.
|
 |
Water Well |
1/7/00 2:24:41 PM Drilling of permanent well by Layne-Arkansas.
|
 |
Lock and Spillway Excavation |
1/6/00 3:56:13 PM Looking downstream from Cell 2.
|
 |
Slurry Wall A |
1/6/00 3:50:28 PM Mixing and placing backfill in Slurry Wall A.
|