| Photo |
Caption |
Description |
 |
Foundation H-Piles |
2/24/00 10:30:36 AM Driving first reaction pile for pile test program.
|
 |
Flooding Structure |
2/16/00 12:54:35 PM Baffles attached to H-piles in scour protection area of flooding structure.
|
 |
Flooding Structure |
2/16/00 12:53:38 PM Baffles installed in front of flooding conduits.
|
 |
Flooding Structure |
2/16/00 12:51:03 PM Threading Z-piles in scour protection side wall.
|
 |
Flooding Structure |
2/16/00 12:43:23 PM Construction of flooding structure scour protection.
|
 |
Lock and Spillway Excavation |
2/16/00 12:42:39 PM Near final grade of overflow spillway foundation.
|
 |
Aerial Photograph 2/15/2000. |
2/15/00 1:26:27 PM Aerial photograph of project on 2/15/2000.
|
 |
Aerial Photograph 2/15/2000. |
2/15/00 1:12:29 PM Aerial photograph of project on 2/15/2000.
|
 |
Aerial Photograph 2/15/2000. |
2/15/00 1:09:50 PM Aerial photograph of project on 2/15/2000.
|
 |
Aerial Photograph 2/15/2000. |
2/15/00 1:02:06 PM Aerial photograph of project on 2/15/2000.
|
 |
Slurry Wall A |
2/4/00 2:53:08 PM Backfilling operations for Slurry Wall A.
|