| Photo |
Caption |
Description |
 |
Lock Centerline |
08/29/2000 1:13:03 PM View of centerline of lock taken downstream of site.
|
 |
Dam Axis |
08/29/2000 1:07:50 PM View of dam axis taken from landside of site.
|
 |
Dam Axis |
08/29/2000 12:59:31 PM View of dam axis taken from riverside of site.
|
 |
Lock Centerline |
08/29/2000 12:55:59 PM View of lock taken upstream of site
|
 |
H-Piles |
08/22/2000 9:14:14 AM Pile driving operations for H-Piles in Dam area.
|
 |
Lock Centerline |
08/18/2000 9:06:11 AM Downstream view at centerline of Lock Chamber
|
 |
Lock Centerline |
08/18/2000 8:58:11 AM Upstream view of Lock Chamber
|
 |
Monolith U-9 |
08/09/2000 9:05:29 AM Placing reinforcing steel in the first lift of Monolith U-9.
|
 |
Aerial Photo |
08/09/2000 7:02:22 AM Aerial photo taken August 2000. Far right monolith U-6 taken from south bank.
|
 |
Aerial Photo |
08/09/2000 7:01:56 AM Aerial Photo of taken August 2000. Monolith U-19 taken from south bank.
|
 |
Aerial Photo |
08/09/2000 7:01:30 AM Aerial photo of Batch Plant taken August 2000
|
 |
Aerial Photo |
08/09/2000 6:59:38 AM Aerial Photo of Jobsite August 2000 taken from south bank
|
 |
Lock Centerline |
08/07/2000 10:35:52 AM View looking upstream centerline lock chamber
|
 |
Dam Axis |
08/07/2000 10:33:30 AM View from riverside centerline dam.
|
 |
Lock Centerline |
08/07/2000 10:31:28 AM Upstream view of centerline lock chamber
|
 |
H-piles |
08/07/2000 10:27:01 AM Driving production H-Piles in NP-1
|
 |
Monolith U-9 |
08/03/2000 5:40:38 PM Preparing foundation for mud slab in Monolith U-9.
|