04/28/2000 11:49:21 AM Sheridan Junior High School visit to site on 4/28/2000.
|
 |
 |
Foundation H-Piles |
04/27/2000 7:21:15 AM Tension test on test pile #8 in monolith R-3.
|
 |
 |
Foundation H-Piles |
04/27/2000 7:07:24 AM Lateral load test on test pile #10 in monolith L-22.
|
 |
 |
Foundation H-Piles |
04/25/2000 8:06:19 AM Tension load test on test pile #7 in monolith R-22.
|
 |
 |
Foundation H-Piles |
04/18/2000 9:08:20 AM Lateral load test on test pile #9 in monolith NPAP-2.
|
 |
 |
Foundation H-Piles |
04/14/2000 11:53:33 AM Lateral load test on test pile #9 in monolith NPAP-2.
|
 |
 |
Foundation H-Piles |
04/13/2000 10:54:49 AM Static compression load test on test pile #6 in monolith NPAP-2.
|
 |
 |
Foundation H-Piles |
04/13/2000 8:11:54 AM Static compression load test on test pile #6 in monolith NPAP-2.
|
 |
 |
Foundation H-Piles |
04/13/2000 8:10:28 AM Static compression load test on test pile #6 in monolith NPAP-2.
|
 |
 |
Foundation H-Piles |
04/07/2000 9:07:46 AM Driving test pile #9.
|
 |
 |
Flooding Structure |
04/06/2000 1:06:19 PM Baffle blocks in flooding structure.
|
 |
 |
Lock and Spillway Excavation |
04/06/2000 12:26:21 PM Dredging material that was excavated from lock and spillway area and deposited just downstream of cofferdam. Material is being pumped to the Mississippi River.
|
 |
 |
Flooding Structure |
04/06/2000 12:10:13 PM Driving "Z" piles in sidewall of flooding structure.
|